Ver tudo

Por favor, use a versão em inglês como a versão oficialRetornar

Europa
France(Français) Germany(Deutsch) Italy(Italia) Russian(русский) Poland(polski) Czech(Čeština) Luxembourg(Lëtzebuergesch) Netherlands(Nederland) Iceland(íslenska) Hungarian(Magyarország) Spain(español) Portugal(Português) Turkey(Türk dili) Bulgaria(Български език) Ukraine(Україна) Greece(Ελλάδα) Israel(עִבְרִית) Sweden(Svenska) Finland(Svenska) Finland(Suomi) Romania(românesc) Moldova(românesc) Slovakia(Slovenská) Denmark(Dansk) Slovenia(Slovenija) Slovenia(Hrvatska) Croatia(Hrvatska) Serbia(Hrvatska) Montenegro(Hrvatska) Bosnia and Herzegovina(Hrvatska) Lithuania(lietuvių) Spain(Português) Switzerland(Deutsch) United Kingdom(English)
Ásia/Pacífico
Japan(日本語) Korea(한국의) Thailand(ภาษาไทย) Malaysia(Melayu) Singapore(Melayu) Vietnam(Tiếng Việt) Philippines(Pilipino)
África, Índia e Oriente Médio
United Arab Emirates(العربية) Iran(فارسی) Tajikistan(فارسی) India(हिंदी) Madagascar(malaɡasʲ)
América do Sul / Oceania
New Zealand(Maori) Brazil(Português) Angola(Português) Mozambique(Português)
América do Norte
United States(English) Canada(English) Haiti(Ayiti) Mexico(español)
CasaProdutosPlacas de desenvolvimento, Kits, programadoresKits e placas de demonstração e avaliaçãoLP8770Q1EVM
LP8770Q1EVM Image
A imagem é apenas para referência. Por favor, consulte as especificações para detalhes do produto.
OPçãO EXPRESSA
Método de pagamento

LP8770Q1EVM - Texas Instruments

Fabricante Modelo do Produto
LP8770Q1EVM
Fabricante
Texas Instruments
Allelco Modelo do Produto
98D-LP8770Q1EVM
garantia
1 ano de garantia Allelco - Descubra mais
Descrição das peças
DEVELOPMENT POWER MANAGEMENT
Embalagem
Box
Ficha de dados
1.LP8770Q1EVM.pdf ...

Folhas de dados

LP8770Q1EVM User Guide.pdf
Estado de RoHS
ROHS3 compatível
Nossa certificação
Disponível: 31437
  • Preço Unitário: $238.80
  • Subtotal: $0.00

Quer um preço melhor?
Adicionar ao carrinho e Enviar RFQ Agora, entraremos em contato com você imediatamente.

Quantidade Preço Unitário Preço Subtotal
1+ $238.80 $238.80
Os preços acima não incluem impostos e taxas de frete, que serão calculados na página de ordem.
OPçãO EXPRESSA
Método de pagamento
Nossa certificação

Especificações

Especificações técnicas LP8770Q1EVM
Texas Instruments - LP8770Q1EVM Especificações técnicas, atributos, parâmetros e peças com especificações semelhantes ao Texas Instruments - LP8770Q1EVM

Atributo do Produto Valor do Atributo  
Fabricante Texas Instruments  
Utilizado IC / Part LP8770-Q1  
Digitar Power Management  
Conteúdos fornecidos Board(s), Cable(s)  
Série -  
Atributos secundários -  
Atributo do Produto Valor do Atributo  
Atributos primários -  
Pacote Box  
Função Special Purpose: Mobiles  
incorporado -  
Número do produto base LP8770  

Classificações ambientais e de exportação

ATRIBUTO DESCRIçãO
Estado de RoHS ROHS3 compatível
Nível de sensibilidade à umidade (MSL) 1 (Unlimited)
Status de alcance REACH Unaffected
ECCN EAR99
HTSUS 8473.30.1180

Peças com especificações semelhantes

As três partes à direita têm especificações semelhantes ao Texas Instruments LP8770Q1EVM

Atributo do Produto LP8770Q1EVM LP8860BQVFPRQ1 LP877451A1RXVRQ1 LP8765RLX/NOPB
Modelo do Produto LP8770Q1EVM LP8860BQVFPRQ1 LP877451A1RXVRQ1 LP8765RLX/NOPB
Fabricante Texas Instruments Texas Instruments Texas Instruments Texas Instruments
Série - Automotive, AEC-Q100 Automotive, AEC-Q100 -
Conteúdos fornecidos Board(s), Cable(s) - - -
Digitar Power Management DC DC Controller - -
Função Special Purpose: Mobiles - - -
Pacote Box Tape & Reel (TR) Tape & Reel (TR) -
Número do produto base LP8770 LP8860 - -
Atributos secundários - - - -
Atributos primários - - - -
Utilizado IC / Part LP8770-Q1 - - -
incorporado - - - -

LP8770Q1EVM PDF da folha de dados

Faça o download do LP8770Q1EVM PDF Datahets e Texas Instruments Documentation para LP8770Q1EVM - Texas Instruments.

Folhas de dados
LP8770Q1EVM User Guide.pdf

Comentários dos Clientes

Avaliação: 10 ARTIGOS

  • Jess***Jones
    17/04/2026

    It offers good value for the price, and the specifications match the description. I’ve been using it for two days with no issues, and I’ll definitely buy it again if I need it in the future.

  • Mich***Smith
    17/04/2026

    Shipping was on time, the component pins are neatly aligned, and I tested 10 of them with a multimeter—all readings were within the specified range. Highly recommended.

  • Aman***arris
    03/04/2026

    It was great—the entire process, from placing the order to receiving the package, went very smoothly. The components were consistent, the price was fair, and I had a very pleasant shopping experience.

  • Mike***nch
    03/04/2026

    Better than expected! The resistance and capacitance readings were spot-on, and it passed the test on the first try. The service was reliable, and the packaging was thoughtful—I highly recommend it.

  • Daic***K.
    23/03/2026

    Very good. No issue after long time testing.

  • Kevi***.
    17/03/2026

    Fast switching and stable output. Very satisfied with this IC

  • Daou***hekebkeb
    16/06/2024

    I had a great experience purchasing items from Allelcoelec, I recommend

  • Uri ***al
    19/06/2024

    Good comunication,
    Transpnt regarding the process and price.

  • Yaqu***l Ali
    19/06/2024

    Providing reasonable prices, regular follow-up of orders, providing accurate and regular invoices, timely delivery of goods, excellent customer service and providing original goods and best quality materials.

  • Lea ***
    19/06/2024

    Morrey was very helpful and right on top of things!
    He replied quickly to my RFQ. He was very courteous and professional.

Escreva uma resenha

Seu endereço de e -mail não será publicado.

Tipo de transporte

Prazo de entrega

Os itens em estoque podem ser enviados dentro de 24 horas.Algumas peças serão organizadas para entrega dentro de 1-2 dias a partir da data, todos os itens chegam ao nosso armazém.E os navios Allelco pedem uma vez por dia por volta das 17:00, exceto domingo.Depois que as mercadorias são enviadas, o tempo estimado de entrega depende dos métodos de envio e do destino da entrega.A tabela abaixo mostra que é o tempo logístico para alguns países comuns.

Custo de entrega

  1. Use sua conta expressa para remessa se tiver uma.
  2. Use nossa conta para a remessa.Consulte a tabela abaixo para obter as cobranças aproximadas.
(Diferentes times de tempo / países / pacote têm preço diferente.)

Método de entrega

  1. Remessa comum global da DHL / UPS / FEDEX / TNT / EMS / SF Apoiamos.
  2. Outros mais formas de remessa, entre em contato com seu gerente de clientes.

Referência de tempo logístico de países comuns
Região País Hora logística (dia)
América Estados Unidos 5
Brasil 7
Europa Alemanha 5
Reino Unido 4
Itália 5
Oceânia Austrália 6
Nova Zelândia 5
Ásia Índia 4
Japão 4
Médio Oriente Israel 6
Referência de cobranças de remessa DHL e FedEx
Taxas de remessa (kg) Referência DHL (USD $)
0,00kg-1,00kg USD $ 30,00 - USD $ 60,00
1,00kg-2.00kg USD $ 40,00 - USD $ 80,00
2,00kg-3,00 kg US $ 50,00 - USD $ 100,00
Observação:
A tabela acima é apenas para referência.Pode ter algum viés de dados para os fatores incontroláveis.
Entre em contato conosco se tiver alguma dúvida.

Apoio de Pagamento

O método de pagamento pode ser escolhido entre os seguintes métodos: Transferência Bancária (T/T, Transferência Bancária), União Oeste, Cartão de Crédito, PayPal.

Seu Parceiro Fiel da Cadeia de Fornecimento -

Entre em contato conosco se você tiver alguma dúvida

  1. Telefone
    +00852 9146 4856

Certificação e Adesão

Veja mais
LP8770Q1EVM Image

LP8770Q1EVM

Texas Instruments
98D-LP8770Q1EVM

Quer um preço melhor? Adicionar ao carrinho e Enviar RFQ Agora, entraremos em contato com você imediatamente.

0 RFQ
Carrinho de compras (0 Items)
Ele está vazio.
Lista de comparação (0 Items)
Ele está vazio.
Opinião

Seu feedback é importante!Na Allelco, valorizamos a experiência do usuário e nos esforçamos para melhorá -la constantemente.
Compartilhe seus comentários conosco através do nosso formulário de feedback e responderemos prontamente.
Obrigado por escolher Allelco.

Assunto
O email
Observações
Código de Verificação
Arraste ou clique para fazer upload de arquivo
Subir arquivo
TIPOS: .xls, .xlsx, .doc, .docx, .jpg, .png e .pdf.
Max Tamanho do arquivo: 10 MB